Friday, 6 November 2026LatestVideosAboutContact
Latest
Wall Street fear gauge soars as retail traders bolt amid market routWhat AI can lose when it makes Holocaust writings easier to readNew research explores how offshore wind development may alter marine food websWorst US stock rout since 2020 leaves virtually nowhere to hide as Nasdaq plunges 6.4%, Dow sheds 1,833 pointsBhopal Police Make Background Verification Mandatory For Home Healthcare Workers, Caretakers And Nursing Attendants; Agencies Must Issue Photo IDs Or Face Legal ActionRanjeev Puri elected as first Indian-American Speaker of Michigan HouseLeaf nutrient balance helps explain earlier fall color in US forestsNew research explores what our appetite for a digital detox can tell usRob Gronkowski says he is ‘not affiliated’ with Erika Kirk's Turning Point USA after viral Election Day videosDiwali 2026 Safety Alert In Indore! Carbide Guns Caused 40 Eye Injuries Last Year, Doctors Warn Children Risk Permanent BlindnessPerplexity launches its own take on AI agents for workPlastic bags and bottles become industrial-strength adhesives through new upcycling method
NationalUpdated 2 hrs ago

Seven Floors, 500 People, No Water! Burst Pipeline Leaves Patients, Attendants Struggling For Two Days At Charak Hospital In MP's Ujjain

Image: Free Press Journal

Ujjain (Madhya Pradesh): A damaged pipeline near Chamunda Mata Mandir Chauraha has left Charak Bhavan of the District Hospital grappling with a severe water crisis for two days, forcing patients, attendants and staff to purchase bottled water and cans from the market.

The seven-storey hospital, accommodating over 500 people at any given time, faces an unusual predicament: water tankers cannot replenish its overhead tanks, all three bore-wells are dysfunctional, and there is no underground storage facility.

The crisis began when Ravi Infrabuild damaged the Public Health Engineering Department (PHED) main pipeline during excavation for elevated corridor piling work. Concrete laid over the damaged section has complicated repairs.

The disruption has affected drinking water, bathing and other essential activities. On Thursday, tanks at Dewasgate, Ksheersagar and Sudam Nagar also remained unfilled.

Charak Bhavan depends entirely on the PHED pipeline to fill its overhead tanks and distribute water throughout the building.

The three bore-wells installed by the construction agency, previously used during supply disruptions, have remained non-functional for months. Their motors are also out of order.

With no underground storage tank, tanker supplies cannot provide an alternative, leaving the hospital administration awaiting pipeline repairs.

RMO Dr Chinmay Chincholikar confirmed the shortage and said a request had been submitted for two new bore-wells, expected to be installed within the week.

Additional municipal commissioner Pawan Kumar Singh said he was unaware of the disruption at Charak Bhavan. He confirmed that repairs were underway but technical difficulties were delaying restoration.

Meanwhile, patients, relatives and hospital staff continue struggling to arrange water for drinking and daily needs, with no immediate alternative available until the damaged pipeline is repaired.

Khategaon TI Dilip Puri Murder Case Sees Two Encounter-Injured Accused Hospitalised Under Tight Security In Indore

This content is published by Free Press Journal and has not been created or edited by Hello Headlines. View original

More in National

See all