Thursday, 12 November 2026LatestVideosAboutContact
Latest
Symbolic clay figurines change our understanding of the prehistoric Middle EastMonkey foot and palm prints differ between individuals, as they do in humansMisunderstandings about statistics common even among experienced researchersSpain's massive stone tombs reveal collective burials continued well into Bronze AgeHours after MI move, Arshdeep Singh announces engagement to actor-model Samreen KaurFrozen sperm enables embryo development in endangered Japanese bird for first time—but chick fails to hatchOverheating cattle: More and more dangerous heat is coming for northern Australia's herdsMumbai Police Register 27 FIRs Against Illegal Firecracker Sales And Storage During Diwali; Restrictions Till December 2US-Backed Lithium Americas Hit by Rising Costs on Trump TariffsAmazon agrees to pay $3M to Arizona customers allegedly trapped in complicated Prime membership cancellation processECI Rejects Claims Of Uncounted Votes In 2024 Maharashtra Elections, Clarifies Mumbai North, Dahanu And Beed FiguresCM Mohan Yadav To Launch ₹1,353 Crore Dahi Irrigation Project, PM Modi To Virtually Address Tribal Day Event In MP's Dhar
NationalUpdated 35 min ago

MMRDA Scraps Uttan Dongri And Pahadi Goregaon Car Shed Plans, 12,000 Trees To Be Spared

Image: Free Press Journal

The Mumbai Metropolitan Region Development Authority (MMRDA) has dropped its plans to build separate Metro car sheds at Uttan Dongri for Metro Line 9 and Pahadi Goregaon for Metro Line 6, 4 with the authority opting to maintain trains of multiple corridors at common facilities.

Shared Metro Depots Expected To Reduce Costs And Land Acquisition Challenges

A MMRDA Official said every Metro line does not require a dedicated car shed in initial stages of operations, as trains operating on interconnected corridors can be maintained at a shared depot.The approach is expected to reduce infrastructure costs and address some of the challenges associated with acquiring land and developing new maintenance facilities.

The decision is also expected to spare around 12,000 trees that would have been affected by the proposed car shed at Uttan Dongri, according to the official.

Metro Line 9 Trains To Be Maintained At Charkop Depot

Trains operating on Metro Line 9, which connects Dahisar East with Mira-Bhayandar, will instead be maintained at the Charkop depot, currently serving Metro Line 7.

Metro Line 9 is an extension of the existing Metro Line 7 corridor, which runs between Andheri East and Dahisar East. Metro Line 7A, being developed from Andheri East towards the airport, is also connected to the same network. With the three corridors linked, MMRDA believes their maintenance requirements can be managed through a common facility.

MMRDA meanwhile soon to launch services on Metro 9.

Metro 6, 4 to operate through pit line

The authority has also decided against developing a separate car shed at Pahadi Goregaon for Metro Line 6, which connects Swami Samarth Nagar with Vikhroli through Jogeshwari . The construction of the 14.5-km corridor is in its final stage and train operations will be supported through a pit line.

A pit line is a specialised maintenance track that allows technicians to inspect and service the underside of trains without having to lift the coaches. The earlier proposal was to develop a car shed for the corridor at Kanjurmarg, but the project could not progress due to land-related hurdles.

Metro Line 6 To Rely On Pit Line Instead Of Dedicated Car Shed

Metro Line 6 is also connected to Metro Line 4, which is being developed between Wadala and Kasarvadavali. The possibility of sharing maintenance infrastructure is therefore expected to help the authority avoid developing another standalone facility.

Mumbai: 333 Firecracker-Related Blazes Reported In 5 Days Despite Fireworks Ban; Teen Dies In Malad

The decision comes at a time when MMRDA is expanding its Metro network across the Mumbai Metropolitan Region but continues to face challenges in securing land for supporting infrastructure.

Construction is underway on 13 Metro lines in the region, but the authority has so far developed only two car sheds, while another depot is under construction at Kasheli.

Public opposition, environmental concerns and land acquisition difficulties have delayed the development of several proposed maintenance facilities.

By allowing more than one corridor to use a common depot, MMRDA hopes to reduce the need for additional land, lower project costs and avoid prolonged disputes over the location of car sheds.

To get details on exclusive and budget-friendly property deals in Mumbai & surrounding regions, do visit: https://budgetproperties.in/

This content is published by Free Press Journal and has not been created or edited by Hello Headlines. View original

More in National

See all