Hyderabad plans 35-km pod car network to ease traffic, link Metro

Hyderabad: The Telangana government has proposed a 35-km network of driverless pod cars in the first phase of a new transit project meant to ease traffic in Hyderabad’s IT corridor and link it with the Metro.
The Phase-I corridor of the Personal Rapid Transit System (PRTS) will run from Kukatpally to Knowledge City via Raidurgam and Biodiversity Park, with 64 stations along the way.
Hyderabad Metro Rail Limited (HMRL) officials presented the plan to Chief Secretary Sanjay Jaju at a meeting at the Secretariat on Wednesday, November 18. Jaju then asked them to draw up a route map and action plan in line with Chief Minister Revanth Reddy’s directions on tackling the city’s traffic congestion.
Demand to more than double
HMRL, which carried out the feasibility study, has projected commuter demand at 3.94 lakh by 2030, rising to 7.96 lakh by 2040 and about 10 lakh by 2050.
The PRTS uses small electric pods on elevated tracks. HMRL also looked at Group Rapid Transit and other options, and both pod systems are to be integrated with Metro Rail and RTC bus services.
Keep costs low, says CS
Jaju said the project should be built at the lowest possible cost. He asked officials to pick routes based on traffic density and passenger needs and to make full use of existing transport infrastructure.
He told HMRL to speed up consultations with technical experts and possible project partners.
The Chief Secretary also called for close coordination among the departments involved, including Municipal Administration, Energy, police, RTC, South Central Railway and the Hyderabad Disaster Response and Asset Protection Agency (HYDRAA), so that traffic planning keeps the city’s future needs in mind.
CM’s push for pod corridors
The review followed a meeting chaired by the Chief Minister on November 12. At that meeting he directed officials to take up a PRTS corridor from KPHB Metro station to Biodiversity Metro station via Durgam Cheruvu and Raheja Mindspace, and to set up a multi-level parking facility with a PRTS depot near IKEA in Gachibowli.
He also wanted the tender for the first corridor finalised by December and the line ready within a year after that.HMRL had earlier said a techno-economic feasibility study was done to assess introducing the system under the public-private partnership (PPP) mode.
Get the latest updates in Hyderabad City News, Technology, Entertainment, Sports, Politics and Top Stories on WhatsApp & Telegram by subscribing to our channels. You can also download our app for Android and iOS.
This content is published by The Siasat Daily and has not been created or edited by Hello Headlines. View original




